The extended mileage limit allows dealers to register a demonstrator vehicle with mileage above 2,000 kilometers as eligible for the EVIP. A dealer is permitted two eligible electric vehicles under the EVIP per calendar year with the extended mileage limit in the program.
Applicants must meet the Program terms and conditions including the eligibility criteria as set out in this Program Guide. EV ChargeON Program is a competitive, application-based grant program offering up to 50-75% of capital funding through post-construction rebates. Level 2 and Level 3 public Charging Stations are eligible for funding in amounts that are proportional to Charger’s power output. The Program is open to eligible public and private sector applicants.
Application for the Manufacturer Plate Program
CVOR registration.
A single trip permit is issued to facilitate an oversize/overweight move for a one way trip along for a limited time period.
Facilitate trailer owners/operators to apply for special permits extending grandfathering provision of non-dump semi-trailers with 4 or more axle or double trailers.
This form needs to be filled out by a Carrier registrant and the requirements indicated submitted along with the form if the Carrier wishes to designate a Service Provider (Permitting Agency) to act on their behalf of the Oversize/Overweight (O/O) Program.
For carriers to apply for enhanced project permits to move similar oversized loads from the same origin and destination for a duration of up to 6 months.
Request Commercial Vehicle Inspection Reports.